UNDP logo  Status of work implemented on UNDP/GEF/00014640 project 
  
 

News

March 2009

A field trip was undertaken to mine’s industrial ground, inspection of the installed vacuum pump and testing of its operation regimes was done. Methane concentration in methane – air blend during the vacuum pump operation was registered at 30-50%.

The permission was obtained by CMMRUC to run acceptance (operational) trial of the VVN1-3 vacuum pump, issued by Rostechnadzor of Kemerovo region.

PR campaign of CMMRUC/project implementation continued and relative publication made in “Expert Sibir” magazine №4-5, February 2009.

February 2009

CMMRUC personnel worked jointly with the Scientific Center «VostNII» specialists to issue the permit for experimental- industrial trial of VVN1-3 vacuum pump, and required documents submitted including: the vacuum –pump technical passport, certificate of conformity, permission to use the pump inside dangerous industrial plants.

Cooperation with US EPA Gas Star Program 
Программа экологически чистых угольных технологий Великобритании
Программа технологий снижения углеродных выбросов Великобритании

 

 

   